The framing for the first floor is complete. The I-joists for the second floor were installed today. The second floor should go up later this week!
John waving from the garage window.
Framed covered back porch.
Tuesday, September 21, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment