Can you believe that the end is almost here! Everyone has been working hard to complete the house so that we can move in. The final inspections for Electrical, Plumbing, and Mechanical will be Monday March 14, 2011 and once we get the water test back on the well we can schedule the inspection to receive our CO. The movers are lined up and so is the closing, fingers crossed it goes smooth.
Here are the latest pictures taken today by John
Exterior with some landscaping complete
Driveway with stamped concrete, our new side yard (the dirt from here was used for the front yard rather than paying to bring in more dirt).
Front sidewalk with alternating stamped concrete and some of the plants.
Driveway with side turnaround to be able to easier access to the two car garage.
Front porch with carriage lights
Bonus room fixtures and carpet
Jack and Jill bathroom shower
Jack and Jill vanity and light fixture
Main stairs looking down from the 2nd floor (the banister, railing and stairs will be stained when complete)
Downstairs 1/2 bathroom vanity
Mudroom coat hooks. We have a white bench that we will be putting below this when we move in.
Back porch fans
Kitchen appliances are installed, lightning, backsplash, and plumbing installed.
Main foyer view from the dining room.
Kitchen view from the other side (entering from the living/dining room area)
Living room with lighting and speakers installed. The mantle area is going to be re-worked and patched since we had a change of plans with the layout for the electronics and speakers.
Master bathroom mirror and lights
Master shower
Master bedroom
Dining room
Study